Boeing Whistleblower: Production Line Has “Enormous Volume Of Defects” Bolts On MAX 9 Weren’t Installed::A reader at respected airline industry site Leeham News offered a comment that suggests they have access to Boeing’s internal quality control systems, and shares details of what they saw regarding the Boeing 737 MAX 9 flown by Alaska Airlines that had a door plug detach inflight, causing rapid decompression of the aircraft. The takeaway appears to be that outsourced plane components have so many problems when they show up at the production line that Boeing’s quality control staff can’t keep up with them all.

    • 2piradians@lemmy.world
      link
      fedilink
      English
      arrow-up
      26
      ·
      10 months ago

      You’d think corporations would learn from these types of failures. But no, not as long as endless growth is the overall plan. The yes men will keep cutting corners at the expense of safety and quality.

        • BakerBagel@midwest.social
          link
          fedilink
          English
          arrow-up
          16
          ·
          10 months ago

          Especially if you can get a new job before something goes wrong. Get an upper management job, strip the metaphorical walls of copper to “cut costs”, and use that on your CV to get a C-suite job somewhere else.

          • Patches@sh.itjust.works
            link
            fedilink
            English
            arrow-up
            6
            ·
            10 months ago

            What do you mean goes wrong?

            Boring still isn’t suffering for this. They’ve made their money and will continue to make more.

          • Raxiel@lemmy.world
            link
            fedilink
            English
            arrow-up
            3
            ·
            10 months ago

            It was Mentor Pilot video on Boeing, he mentioned they had some fancy automated QA system they pissed a load of money up the wall on, and in the end they still had to spend just as much on rework and it was scrapped.
            I’ve no idea if they hired new QA people after, but even if they did it wouldn’t be the same people back, what with their “brilliant” idea of shedding expensive, experienced staff in Washington and replacing them with cheaper inexperienced hires in South Carolina

    • monkeyslikebananas2@lemmy.world
      link
      fedilink
      English
      arrow-up
      15
      ·
      10 months ago

      “Our QC never finds any major issues, if we cut budget here, here and here we can increase EBIDTA, yada yada MOAR PROFITS since our processes are perfect anyway!”

      • The bean counter
      • Patches@sh.itjust.works
        link
        fedilink
        English
        arrow-up
        4
        ·
        10 months ago

        And now that they’ve laid off all of QC.

        QC still never finds any major issues. That means we never needed them.