For the first time in the United States, turbines are sending electricity to the grid from the sites of two large offshore wind farms.

The joint owners of the Vineyard Wind project, Avangrid and Copenhagen Infrastructure Partners, announced Wednesday the first electricity from one turbine at what will be a 62-turbine wind farm 15 miles (24 kilometers) off the coast of Massachusetts.

Five turbines are installed there. One turbine delivered about 5 megawatts of power to the Massachusetts grid just before midnight Wednesday. The other four are undergoing testing and should be operating early this year.

Danish wind energy developer Ørsted and the utility Eversource announced last month that their first turbine was sending electricity from what will be a 12-turbine wind farm, South Fork Wind, 35 miles (56 kilometers) east of Montauk Point, New York. Now, a total of five turbines have been installed there too.

    • SeaJ@lemm.ee
      link
      fedilink
      arrow-up
      4
      ·
      10 months ago

      Sure since it was poorly worded. It is good for baseload and being able to increase or decrease output based on demand. Wind can’t do that without a battery.

      • IchNichtenLichten@lemmy.world
        link
        fedilink
        English
        arrow-up
        1
        ·
        10 months ago

        being able to increase or decrease output based on demand

        Can you provide a source for this claim? My info is that this isn’t accurate.